Comnet Copper Line CLFEEO Series 설치 및 운영 매뉴얼 - 페이지 12

{카테고리_이름} Comnet Copper Line CLFEEO Series에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Comnet Copper Line CLFEEO Series 12 페이지. Ethernet over copper extender with pass-through poe to 15 watts

INSTALLATION AND OPERATION MANUAL
INSTALLATION CONSIDERATIONS
These units are supplied as Standalone/Rack mounted module. Units should be installed in dry locations protected from extremes of temperature and
humidity.
WARNING: Unit is to be used with a Listed Class 2 power supply.
IMPORTANT SAFEGUARDS:
A) Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than
room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (T
specified by the manufacturer.
B) Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.
3 CORPORATE DRIVE
8 TURNBERRY PARK ROAD
© 2014 Communication Networks. All Rights Reserved. "ComNet," the "ComNet Logo," "CopperLine,"
and the "CopperLine Logo" are registered trademarks of Communication Networks.
|
|
DANBURY, CONNECTICUT 06810
USA
|
|
|
GILDERSOME
MORLEY
LEEDS, UK LS27 7LE
|
|
|
T: 203.796.5300
F: 203.796.5303
|
|
T: +44 (0)113 307 6400
F: +44 (0)113 253 7462
CLFE(X)EO(C,U) SERIES
|
TECH SUPPORT: 1.888.678.9427
|
INS_CLFE(X)EO(C,U)_REV– 10/27/11 PAGE 12
)
ma