AirTech AIR+PIV/L-B 설치 및 커미셔닝 지침 - 페이지 9
{카테고리_이름} AirTech AIR+PIV/L-B에 대한 설치 및 커미셔닝 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. AirTech AIR+PIV/L-B 16 페이지. Positive input ventilation unit
![AirTech AIR+PIV/L-B 설치 및 커미셔닝 지침](/uploads/products/server2/143730/143730.jpg)
Boost Switch Link Connector option (Ref:- 411150)
IMPORTANT:
Do not connect mains or any other device to the remote boost cable. It is only
intended to be linked via a remote volt free switch to activate the boost
function
.
1) Connect the boost cable (supplied with 411150) to the connector under
the display (on the fan).
2) Wire the boost switch to the two terminals within the junction box.
Ensure the cable is secured properly. The switch links the two wires
together to activated boost remotely. Once deactivated the fan overruns
for the set timeout period (*see bst timer within the fan menu).
a. Normally open – normal mode/trickle
b. Closed link
*Within the fan menu "bst" can be set to have an overrun timer of either 0,
1hr, 2hr, 4hr, 8hr.
– boost is activated.
9