Hot Water Outlet
Where a maximum hot delivery temperature is specified by local, state or federal regulations, a tempering valve
shall be installed at the hot water outlet, as required.
The supplied temperature & pressure relief (TPR) valve must be installed as shown in the hydraulic schematic. The
TPR valve should be connected to a drain point to accommodate discharge as a result of both water expansion
during heating and also pressure fluctuations.
The supplied PTR valve must be fitted with Teflon tape – do not use paste or hemp or other thread sealers.
DN15 copper drain lines must be connected to the discharge pipe of the TPR valve. The copper drain line must fall
away from the water heater and be installed in a frost-free environment.
The termination point of a drain line must comply with the requirements of AS/NZS 3500.4
WARNING: The TPR valve and drain line must not be sealed or blocked.

ELECTRICAL INSTALLATION

Electrical Connection
All electrical work must be carried out by a registered electrician and in accordance with AS/NZS 3000.
The Atlantic Vertigo water heater must be filled with water before connection to a power supply.
Switch off the power before removing the cover to avoid any risk of injury or electric shock.
The installation must be equipped, upstream of the appliance, with a bipolar cut-out device (fuse breaker switch)
respecting local regulations (30 mA earth-leakage breaker).
Always connect the earth conductor of the cable to the earth ground dire or connect the earth conductor to the
appropriate terminal identified by the symbol.
6