AirTechnic ENERGY BOX - TO 800 조립 및 유지보수 매뉴얼 - 페이지 8
{카테고리_이름} AirTechnic ENERGY BOX - TO 800에 대한 조립 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AirTechnic ENERGY BOX - TO 800 20 페이지. Ceiling type heat recovery unit (aluminium plate)
INSTALLATION
Preparing The Sling Bolts
Attaching the duct connection Flanges
Installation of The Unit
ENERGY BOX Unit
ENERGY BOX Unit
+30.211.70.55.500
ENERGY BOX 350 - 3.500
ENERGY BOX 4.650 - 5.735
+30.210.22.23.283
Hang the suspension braket on the anchor bolts and adjust in such a way
that the unit is installed horizontally. Tighten up securely using double nuts
in order to prevent looseness.
Check the stability of sling
bolts during the installation.
If the duct connection flanges are not connected to the unit, use the screws
that can be found in the installation package to connect the flanges to the
unit as the figure on the left.
Hang the unit on the anchor bolts and adjust in such a way that the
unit is installed horizontally. Tighten up securely using double nuts in
order to prevent looseness.
Hang the unit on the anchor bolts and adjust in such a way that the
unit is installed horizontally. Tighten up securely using double nuts in
order to prevent looseness.
Do not handle the unit in such way
that force will be applied to the
control box when suspending the
main unit from the ceiling.
! WARNING
! WARNING
Before attaching the duct
connection flanges, check
that no foreign matter has
found.
! WARNING
8