Ankom TDF Series 서비스 절차 - 페이지 3
{카테고리_이름} Ankom TDF Series에 대한 서비스 절차을 온라인으로 검색하거나 PDF를 다운로드하세요. Ankom TDF Series 9 페이지. Vacuum sensor installation
Ankom TDF Series에 대해서도 마찬가지입니다: 서비스 절차 (7 페이지), 서비스 절차 (4 페이지)
6.
Gently feed the black 25 pin Cable Connector plug through
the hole in the front of the instrument, being careful not
to get it caught on the tubing and air lines.
7.
Set the faulty Paddle Bar Assembly aside for return to ANKOM.
8.
Prepare the new replacement Paddle Bar Assembly.
Remove the cable-tie from the Paddle Bar Hinge Post on the
left side. Be careful as the hinge block will fall off the Hinge
Pin if tilted.
9.
Install the new Paddle Bar Assembly.
Feed the black 25 pin Cable Connector through the hole in
the front of the instrument.
10.
Loosely install the four screws.
Line up the two Paddle Bar Hinge Posts with the four screw
holes to the right and left being sure to loosely install the
four screws with the 5/32" Hex key wrench.
ANKOM Technology 2052 O'Neil Road Email: [email protected] Phone: 315-986-8090 Fax: 315-986-8091
Paddle Bar Replacement
TDF
Front view
Cable
Connector
Hole
Rear view
Cable
Connector
inserted
through hole
Cable-tie
on
Left side
Hinge Post
Cable
Connector
5/32"
Hex Key
Wrench
TS021
Service Procedure
Revised: 01/24/2017
pg. 3 of 9