ABSINA 34-116-1002 운영 매뉴얼 - 페이지 12
{카테고리_이름} ABSINA 34-116-1002에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABSINA 34-116-1002 20 페이지.
5. INSTALLATION
1. After opening the wallbox, check it for completeness
and damage. In the event of damage, inform the
transport service immediately and do not install the
wallbox.
2. The wallbox may only be installed by trained
specialist personnel.
3. The connection on the input side must be made with
a suitable power cable with at least 5x2.5mm².
4. On the building side, each phase must be equipped
with an automatic circuit breaker and FI circuit
breakers and have the appropriate cable cross-
sections for the power.
5. Remove the cover of the connection strip on the
back of the unit using 4 screws (1). Feed the input
cable through the rubber grommet and secure it
with the strain relief using the retaining clip and 2
screws (2).
6. Remove the protective cover over the contact strip.
Screw the 3 phases, N & PE to the contact strip
using ring cable lugs according to the connection
diagram, insert the protective cover over the
contact strip and screw the cover back onto the
housing (1).
Deutsch . English