Daintree GE current 93013528 설치 매뉴얼 - 페이지 3
{카테고리_이름} Daintree GE current 93013528에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Daintree GE current 93013528 4 페이지. Led luminaire
Lumination
(Tetra
®
2
Using the diagram below as an estimation guide, begin cutting strings of modules to create 8-inch (203 mm) tall
rows and 12-inch (305 mm) wide columns.
Modules should be 2 inches (51 mm) from the edge of the application with 2.77 inches (70 mm) between
each column.
Install Modules
1
Lay modules into the application at least 2 inches (51 mm)
from the edges.
Fasten down each module with at least one screw
in the center hole or two opposing sides.
PowerGrid - Series)
®
12" (305 mm)
wide columns
2.77" (70 mm)
Typical layout
between columns
2
Start another row with 2.77-inch (70 mm) spacing between
the module strings.
Continue this process until the entire application is
populated with modules.
3
Installation Guide
between
columns
2" (51 mm)
from edge
2.77" (70 mm)
2" (51 mm)
between columns
from edge
2.77" (70 mm)
2" (51 mm)
from edge