Daintree GE current Lumination LIB 설치 매뉴얼 - 페이지 3
{카테고리_이름} Daintree GE current Lumination LIB에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Daintree GE current Lumination LIB 4 페이지. Linear in-bay lighting
Lumination® LIB
Continuous Run Installation
2
A
Repeat step A of the "Single
Fixture Installation" process.
Do not provide a power source
to the luminaire. Do not
remove protective film.
D
Repeat step 2C until the
desired number of fixtures are
connected in a continuous run
(26 fixtures at Maximum).
Center the length of the
fixtures within the installed
mounting clips. Press and snap
the fixture into the mounting
clips, with the male power
connector facing the power
supply drop.
B
Determine the desired
spacing between luminaires.
If additional space is desired
between the luminaires,
continue to Section 3A. Install
the brackets for the remaining
fixtures in a straight line,
according to Fig. 1A
peeling off the film
E
Connect the protective cap to
the unused female connector.
Remove the protective film on
the diffuser. Connect the power
cord to the male connector.
Installation Guide
C
Snap the second fixture into
the correlating mounting
brackets. Align the mating
features on the male and
female connectors. Press
together until a "click" is heard.
Note: If you do not hear a click, the
connection has not been properly
made. Disconnect and retry until a
"click" is heard
Note: If the dovetails will not align,
adjustment to the mounting brackets
or a linking cord may be necessary.
F
Plug the power cord into a
120VAC supplied outlet.
(The maximum distance to
the receptacle is determined
by the length of cord
provided.)