Daintree GE current Lumination Recessed Architectural LAC Series 설치 매뉴얼 - 페이지 2

{카테고리_이름} Daintree GE current Lumination Recessed Architectural LAC Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Daintree GE current Lumination Recessed Architectural LAC Series 2 페이지. Led luminaire

Lumination
(Recessed Architectural Luminaire Series)
®
Door Replacement Steps
NOTE: The following steps depict the 2x2 series luminaire. However, the procedure is the same for the 2x4 series.
1
Turn off power.
2
Rotate latches to unlock the front bezel.
Remove replacement door from packaging and
4
inspect door before installing. Ensure diffuser has
not loosened from door frame.
6
Restore power after panel is closed.
www.gecurrent.com
© 2021 Current Lighting Solutions, LLC. All rights reserved. GE and the GE monogram are trademarks of the
General Electric Company and are used under license. Information provided is subject to change without
notice. All values are design or typical values when measured under laboratory conditions.
IND213 (Rev 04/02/2021)
3
Swing down panel and lift off front bezel with diffuser.
5
Hang panel on its hinges and swing up into place.
Rotate latches on front bezel to fasten it.
Installation Guide