3One data IES608-2F 하드웨어 설치 매뉴얼 - 페이지 8

{카테고리_이름} 3One data IES608-2F에 대한 하드웨어 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 3One data IES608-2F 11 페이지. 8-port 10/100m industrial ethernet switch

Switch
Switch
Settings:
Settings:
Switch
Switch Settings:
Settings:
Provide 4 bit switch for function setting (ON is enable): 1(ISP) is
DOWNLOAD PROGRAM,2 is RESUME DEFAULT,3is SW-Ring
Enabled ,4 is blank (NC).When the switch is setup, must be restart.
DOWNLOAD
DOWNLOAD
DOWNLOAD
DOWNLOAD PROGRAM
IES608-2F series provide one DOWNLOAD PROGRAM port
(RJ45 type), on the top panel, manage the system with PC by
RJ45-DB9F adapter.
Installation
Installation
Installation
Installation:
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant space.
whether it is close to the connection equipment and other
equipments are prepared or not.
Installation
Installation
require
require as as as as below
require
Installation
Installation require
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut ,tool provide for yourself.
5.Power need: Redundant, dual 24VDC power inputs(12~36DC)
6. Environment: -40°C to 75°C
Storage Temperature: -45°C to 85°C
Relative humidity 10% to 95%
DIN-Rail
DIN-Rail
Installation
Installation
DIN-Rail
DIN-Rail Installation
Installation
In order to use in industrial environments expediently, IES608-2F
PROGRAM
PROGRAM port
PROGRAM
below
below
below
YourSerial and Data Communications Expert
port
port: : : :
port
Shenzhen 3onedata T echnologyCo.,Ltd