AddEnergie CoRe+PSV2 설치 매뉴얼 - 페이지 8

{카테고리_이름} AddEnergie CoRe+PSV2에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AddEnergie CoRe+PSV2 14 페이지.

Wall or Post Mounting

Power cable entry under the station
• IMPORTANT, never
remove the protection
plate of the keyhole.
• Attach the head base to
the wall or the post with
appropriate type of anchors
• Hang the head base to an
anchor (previously fixed
to the wall or post) via
the keyhole at the top.
NEVER REMOVE THE
PROTECTION PLATE
• Complete the mounting of
the head base by installing
an anchor through the
bottom hole.
2016 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
• Avoid installing the EVSE in bad weather
conditions.
GND
• Remove the hole cover and attach the
cable connector to the hole, then insert the
power cable. Make sure the conductors are
long enough to reach the terminal block.
L1 L2
• Connect two power
conductors (L1 and
L2) and the ground
conductor (GND)
• The grounding
conductor shall be
provided with green
or green and yellow
insulation.
8