AddEnergie SmartDC 설치 매뉴얼 - 페이지 8
{카테고리_이름} AddEnergie SmartDC에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AddEnergie SmartDC 15 페이지. V2
Typical Installation
D
A
B
E
C
F
G
A: Electrical equipment cabinet (metering, protection and distribution)
B: Power cable (three-phase 480Y/277 Volts @ 100A + NEUTRAL + GROUND)
C: SmartDC Station
D: Master disconnect switch (must be visible from the station)
E: Parking space for the electric vehicle
F: Protective bollard
G: Concrete Slab
8
2017 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice