Comtech EF Data FOB-21 설치 매뉴얼 - 페이지 3

{카테고리_이름} Comtech EF Data FOB-21에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Comtech EF Data FOB-21 5 페이지.

Chose the necessary cable input. Cables with up to 7mm in diameter we recommend to use
3
PG-9 cable input (not included in the set), for thicker cables (up to 12mm) – using knife you
have to cut out wider space in the back of the panel according to indicated lines.
Cables can be inserted in any of the five units. If cable is only one, we recommend using one
of the mentioned units.
Cable diameter 8-12 mm
4a
For installing thin cables via PG9
Insert PG-9 cable input in the opening
and secure it with screw-nut.
5a
For installing thin cables via PG9
Pull cable trough PG-9 so that in the patch
panel there should be 5 cm long cable
outer isolation and pull tighter cable
fastening screw-nut.If you are planning to
convey incoming cable to another unit,
leave a bit longer cable thread with
uncleared cable isolation.
FOB-21 Installation guide
4b
For installing thick cables via strips
If you are using thicker than 7mm cable,
place it through previously cut opening
so that inside the enclosure should be
30 cm long cable ending. Create cable
bends to other units.
5b
For installing thick cables via strips
Fasten cable with plastic strips at the
input and at juncture.
Page 3
Cable diameter 4-7 mm
COMTECH ltd.