3onedata IES6300PRO Series 빠른 설치 매뉴얼 - 페이지 2
{카테고리_이름} 3onedata IES6300PRO Series에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 3onedata IES6300PRO Series 5 페이지. Layer 2 managed industrial ethernet switch
1.
DI and DO terminals (DI1-DI2, DO1-DO2)
2.
Power supply input terminal block
- DC device power input terminal (P1-P2)
- AC device power input terminals (L, N)
3.
Terminal blocks for relay alarm output (RELAY)
4.
DIP switch (1-SW-4)
5.
CONSOLE port
6.
Grounding screw
7.
DIN-Rail mounting kit
8.
System indicators, from left to right in turn they are:
-
Running Indicator(RUN)
-
Alarm Indicator(ALM)
-
Power Supply Indicator (DC: P1-P2; AC:
PWR)
9.
LED digital tube
10.
USB interface
11.
10/100/1000Base-T(X) Gigabit Ethernet RJ45:
-
Model I, Model III: Gigabit copper ports
(G1-G8)
-
Model II: Gigabit copper ports (G1-G8)
-
Model IV, Model VI: Gigabit copper ports
(G1-G16)
-
Model V: Gigabit PoE copper ports (G1-G16)
12.
100/1000Base-X SFP slot (G11-G12/G19-G20)
13.
100/1000/2.5GBase-X
SFP
G17-G18)
14.
Ethernet port indicator (G1-G12 / G1-G20)
15.
PoE indicator (G1-G8 / G1-G16)
【Mounting Dimension】
Unit: mm
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【DIN-Rail Mounting】
The product adopts 35mm standard DIN-Rail mounting which
is suitable for most industrial scenes, mounting steps as
follows:
slot
(G9-G10
/
Check if the DIN-Rail mounting kit is installed firmly.
Clip the upper part of the DIN-Rail mounting kit, i.e.
the fixed side, into the DIN rail.
Press the lower side of the device and insert the
lower part of DIN-Rail mounting kit (the side with
spring support) into DIN-Rail.
Tips:
The DIN-Rail spring support is a metal sheet that can
move up and down, and there will be a sound after it is
clamped in.
Check and confirm the product is firmly installed on
DIN rail, then mounting ends.
【Disassembling DIN-Rail】
Power off the device.
Use a slot type screwdriver or other tools to move
the DIN rail spring support downward; At the same
time, move the lower side of the device outward
and move out the lower part of the DIN rail
mounting kit.
Lift the device upward slightly, move out the upper
part of DIN-Rail mounting kit. Disassembling ends.
Notice before power on:
Power ON operation: First insert the power supply
terminal block into the device power supply interface,
then plug the power supply plug contact and power on.
Power OFF operation: First, remove the power plug,
then remove the wiring section of terminal block. Please
pay attention to the above operation sequence.