Duco DucoBox Focus 설치 매뉴얼 - 페이지 12

{카테고리_이름} Duco DucoBox Focus에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Duco DucoBox Focus 16 페이지.
Duco DucoBox Focus에 대해서도 마찬가지입니다: 사용자 설명서 (2 페이지), 설치 매뉴얼 (20 페이지), 빠른 시작 (4 페이지)

Duco DucoBox Focus 설치 매뉴얼
ENGLISH

07 Air calibration

For the system to work correctly, it needs to be configured� This will ensure its operation is as quiet as possible and energy-ef-
ficient� For information on determining the ventilation flow rates, see Instruction Sheet Checking Product References and Flow
Rates at www�duco�eu�
07.A Air calibration procedure for DucoBox Focus
The air calibration procedure must be carried out on a calm day (no more than wind force 2: leaves rustling,
feeling the wind in one's face)�
DucoBox Focus air calibration
The exhaust vents must be set depending on the situation� Proper pre-setting makes for rapid and correct configuration�
1
SITUATION 1 :
one vent per valve
Set all vents to the fully open
position, regardless of the desired
flow rate�
When using DucoVent Design exhaust vents always leave
the outer ring in place for acoustic effect�
12
L2000631 Installation guide for DucoBox Focus (Revision L | 06.09.2022)
SITUATION 2 :
Multiple vents per valve
with equal flow rates
Set all vents to the fully open
position, regardless of the desired
flow rate� Set the valve to the
sum of the vent flow rates via the
display menu or the Duco Network
Tool� Example: 2 vents, 50 m³/h
each → set valve to 100 m³/h�
+
=
m
Flow rate
75m3/h
50m3/h
25m3/h
SITUATION 3 :
Multiple vents per valve
with different flow rates
Set the exhaust vents so they
match the desired flow rate in line
with the table below� Set the valve
to the sum of the vent flow rates
via the display menu or the Duco
Network Tool� Example: 25 m³/h
vent and 75 m³/h vent → set valve
to 100 m³/h�
+
100
/h
3
DucoVent
DucoVent Basic
Design
and other vents
=
100
m
/h
3
100% open
50% open
25% open