Anzzi Anzzi SB-AZ01RO 설치 및 운영 매뉴얼 - 페이지 7
{카테고리_이름} Anzzi Anzzi SB-AZ01RO에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi Anzzi SB-AZ01RO 14 페이지. Shower base
STEP 5
Apply a generous amount of mortar that
●
has been mixed to a thick consistency.
Place the base in the wet mortar, adjust
until it is level, and let mortar cure for
24 hours. Proceed to the next step. (Fig 5)
STEP 6
It is recommended not to stand in base
●
while securing to wall. Set base in corner
and press it into mortar.
Secure flanges to all studs with #8(1-1/2")
screws through previously drilled holes.
(Fig 6)
IMPORTANT: Gaps between flanges and
studs must be less than 1/8". Insert shims
to fill gaps if needed.
Mortar
Fig. 5
Shim
Fig. 6
5