Duerkopp Adler 745-22 설치 지침 및 교체 부품 목록 - 페이지 9
{카테고리_이름} Duerkopp Adler 745-22에 대한 설치 지침 및 교체 부품 목록을 온라인으로 검색하거나 PDF를 다운로드하세요. Duerkopp Adler 745-22 14 페이지.
3.5 Throw-over Stacker (Optional Equipment)
1
6
14
13
2
3
4
7
11
The throw-over stacker (Order no. Z112 427514) is attached to the
frame of the sewing unit with holder pipe 1.
At delivery of the sewing unit the holder pipe 1 is already premounted
on the frame brace 3.
12
If the throw-over stacker is delivered separately packed, the holder
pipe 1 must first be attached to the frame brace 3 of the sewing unit.
–
Mount guard plate 12 on the housing 11 of the throw-over stacker
with screws, washers and spring washers.
–
Fasten holder pipe 1 on the frame brace 3 of the sewing unit with
screws, washers and brackets 6.
–
Fasten spar 4 on the brace 5 of the stacker stand with screws,
washers and bracket 7.
–
Insert the ribbed plug 8 in spar 4.
–
Push the throw-over stacker toward the frame of the sewing unit so
that spar 4 catches in the holder pipe 1.
The height of spar 4 is adapted to the holder pipe 1 via the slots in
13
brace 5 of the stacker stand.
–
Insert the coupling plug of the compressed air feed into hose
coupling 10.
–
Insert the coupling plug of the control lead into hose coupling 9.
–
Attach one end of the potential cable 13 to the stopper plate 14 of
the throw-over stacker with the enclosed wing nut.
Attach the other end to the frame of the sewing unit with the
existing wing nut.
The potential cable 13 serves to conduct static charges to ground.
–
After starting the sewing unit with the throw-over stacker open, set
the clearance to the sewing unit.
The sewing pieces must securely enter the opening between the
smoother and the stacked-goods support.
–
Tighten clamping lever 2.
5
8
9
10
9