Duerkopp Adler 745-23 설치 지침 및 교체 부품 목록 - 페이지 13

{카테고리_이름} Duerkopp Adler 745-23에 대한 설치 지침 및 교체 부품 목록을 온라인으로 검색하거나 PDF를 다운로드하세요. Duerkopp Adler 745-23 14 페이지.

Duerkopp Adler 745-23 설치 지침 및 교체 부품 목록

4.5 Checking the Positioning

1
Before commissioning check the positioning set at the factory.
After turning on the main switch the sewing unit must position in
the needle high position (Position 2).
Checking the positioning
Turn the main switch off.
Bring the thread lever into a middle position by turning the
handwheel.
Turn the main switch on.
The sewing unit positions in needle high position (Position 2).
The thread lever must lie 2 mm behind its upper dead center.
Check the position of the thread lever.
If necessary correct the positioning.
Correcting the positioning
Loosen clamping screws 2 on the synchronizer.
Hold the synchronizer collar 1 tight.
Move the thread lever to 2 mm behind its upper dead center by
turning the handwheel.
Tighten the clamping screws 2.
Check the positioning again.
For the setting of the 1st needle position (needle low position)
see Service Instructions.
2
13