Duerkopp Adler 745-24 설치 지침 및 교체 부품 목록 - 페이지 4

{카테고리_이름} Duerkopp Adler 745-24에 대한 설치 지침 및 교체 부품 목록을 온라인으로 검색하거나 PDF를 다운로드하세요. Duerkopp Adler 745-24 14 페이지.

Duerkopp Adler 745-24 설치 지침 및 교체 부품 목록

2.2 Transport

1
2

2.3 Setting the Work Height

4
The stand of the sewing unit is equipped with four castors for in-house
transport.
ATTENTION !
Before commissioning the sewing unit place the sound absorbers 2
(in the accessories pack) on the four feet of the stand.
Turn in the castors until the stand is stable.
Run the castors out for transport by turning the setting screws 1 to
the left.
The feet of the stand must have sufficient ground clearance for
transport.
After transport lower the sewing unit by turning the setting screws
1 to the right.
The feet of the stand must be firmly on the ground.
The work height is adjustable between 87 cm and 110 cm (measured
to the upper edge of the table).
The sewing unit is set at the factory at the lowest work height of 87 cm.
Loosen the fastening screws 3 on all four spars of the stand.
Set the base plate horizontally to the desired work height.
In order to prevent twisting pull out or push in the base plate
uniformly on both sides.
Tighten the fastening screws 3.
3