Anzzi SH-AZ101BG 설치 및 운영 매뉴얼 - 페이지 5

{카테고리_이름} Anzzi SH-AZ101BG에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi SH-AZ101BG 12 페이지. Rainfall shower bar

INSTALLATION

1
Hot
1/2"
35.5"-39.4"
STEP 1:
Ensure that the center distance of
outlets are between 5.7" - 6.1".
The Hot inlet is on the Left,
and t h e Cold inlet is on the Right.
The he ight of the inlets from the oor
is about 35.5" - 39.4". Ensure each
inlet with the same height.
3
STEP 3:
Turn on the valves an
and cold supplies thoroughly for 30s
to 1 minute. Then turn o
and seal the wall around the nipples
with waterproof sealant.
Cold
Floor
ush the hot
he valve
2
a.
b.
STEP 2:
a. Wrap the smaller point of
N
p i
p
e l
s
0 [
] 8
with water sealing tape.
b. Install the Nipples [08] and secure
by wrench.
4
[07]
STEP 4:
Install the Covers [07] and place the
leveler on the Covers [07] and make
sure the leveler is in level condition.
Then place the leveler on the shanks.
Make sure the leveler is in level
condition and the distance between
the shanks is 5.9".
[08]
shank
PG. 3