Anzzi Fissure Series 설치 및 관리 매뉴얼 - 페이지 6

{카테고리_이름} Anzzi Fissure Series에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi Fissure Series 8 페이지. Shower base

Anzzi Fissure Series 설치 및 관리 매뉴얼
INSTALLATION
Position the shower base over so the waste drain and the
04
drainage pipe are aligned. The shower base should butt up
against the drywall.
Lower the base over the drain and set against the studs.
See Fig. 4
Left Hand
Right Hand
Mix your bedding material (i.e. mortar or cement-sand). It is NOT
05
RECOMMENDED to use concrete or plaster. Apply enough
bedding to support the complete bottom of the base. This will
make sure the base will not shift positions as well as provide
additional stability.
See Fig. 5
Left Hand
Alcove
Alcove
Right Hand
6