Danfoss 080Z3226 사용자 설명서 - 페이지 5
{카테고리_이름} Danfoss 080Z3226에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Danfoss 080Z3226 20 페이지. Three phase
User Guide | Optyma™ control AK-RC 113 three phase
4.0 Installation
4.1 Standard equipment for
assembly and use
4.2 Mechanical assembly of
the panel
© Danfoss | DCS (vt) | 2020.03
The AK-RC 113 electrical panel, for assembly and use, is equipped with:
• Nr 4 sealing gaskets, to be placed between the fixing screw and the back of the box
• Nr 1 use and maintenance manual
• Nr 1 wiring diagram
• Nr 1 drilling layout
• Nr 2 NTC probes 10K 1%
• Each panel is designed for wall mounting; choose an appropriate fixing system, depending on the
weight of the panel and the type of support on which it will be fixed.
• Install the panel in places that respect its IP rating.
• Keep the IP protection level of the appliance intact by properly assembling the cable glands and/or
the pipe clamps with appropriate characteristics.
• Install the panel at a height that allows the operator an easy use and internal access. The operator
should not come to be in a dangerous situation when he is working on the panel. The height must
however be between 0.6 and 1.7 meters from the floor.
• Install the electrical panel in an area away from sources of heat and possibly protected from
atmospheric agents.
Following are the steps to perform a correct mechanical installation of the panel:
Fig 1. Lift the transparent protection cover of the general
magneto-thermal switch.
Fig 3. Unscrew the 4 fixing screws of the front panel.
Fig 5. Open the front of the panel by lifting it up and
sliding the two black hinges up to the end of the stroke.
Fig 2. Remove the screw cover on the right side.
Fig 4. Close the transparent protection cover of the general
magnetothermal switch.
Fig 6. Flex the hinges and rotate the front panel 180°
downwards to access the inside of the panel and
disconnect the electronic board connector.
BC317523579312en-000101 | 5