Duke FLM200 지침서 - 페이지 6
{카테고리_이름} Duke FLM200에 대한 지침서을 온라인으로 검색하거나 PDF를 다운로드하세요. Duke FLM200 8 페이지.
Installation and Operation of: Product Name
INSTALLATION OF NEW LIGHT/GASKET - cont.
Repeat steps 1-7 for opposite side if needed.
8
Reinstall the two bolts under the front of
9
the counter that were removed in step 10 of
Removal of existing light/gasket.
Carefully slide unit back in place and align with
10
front line up.
Using the Bolt and cap nuts removed in
11
previous steps re-secure and tighten the glass in
place using a Phillips screwdriver and 7/16 wrench
or socket.
Re-install the cover plates on both sides if
12
removed.
6
Install Screws
Re-install the top cap cover.
13
Re-connect lights to power supply.
14
Re-install side support racks.
15
Re-install racks.
16