Casella Evolution CM2010 서비스 매뉴얼 - 페이지 15
{카테고리_이름} Casella Evolution CM2010에 대한 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Casella Evolution CM2010 16 페이지. Internal zero and span module ozone analyser
Lamp Replacement
Over time the UV lamp output degrades. This may cause the O
or too low. Replace the UV lamp as follows:
1. Turn the analyser off.
2. Loosen the set screw securing the UV lamp into the generator body.
3. Disconnect the UV lamp electrical connector from the IZS Control PCA.
4. Slide the UV lamp out of the generator body.
5. Install the new lamp in the generator body.
6. Connect the UV lamp electrical connector to the IZS Control PCA.
7. Turn the analyser on and allow it to stabilize.
8. Perform the UV lamp adjustment procedure. Refer to Lamp Replacement section.
Generator Cleaning
The quartz tube inside the O
the tube may become contaminated or dirty, resulting in noisy or low output values from the O
tor. Clean the tube as follows:
The quartz tube is fragile. Exercise extreme care during han-
dling.
1. Turn the analyser off.
2. Disconnect the inlet and outlet tubing from the O
3. Remove the fitting from the front end of the O
of the generator housing.
4. Clean the quartz tube using a mild soap or alcohol. Avoid leaving dirt, lint, or fingerprints on the
body of the quartz tube. Allow the tube to air dry before installation.
5. Reinstall the quartz tube in the generator body and reinstall the fitting on the front of the tube.
The fitting must be tightly secured, but be careful not to crack the quartz tube.
6. Reconnect the inlet and outlet tubing.
7. Leak test the IZS module. Refer to
8. Turn the analyser on and allow it to stabilize.
9. Recalibrate the ozone generator. Refer to the CM2010 IZS Module Operation Instructions.
HB4014-02
generator is where the actual production of ozone takes place. Over time,
3
WARNING:
Leak Test
EVOLUTION SERIES CM2010 OZONE ANALYSER
generator output to become unstable
3
generator.
3
generator and slide the quartz tube out the rear
3
on page 12.
genera-
3
15