cashco 521 설치, 운영 및 유지보수 매뉴얼 - 페이지 6

{카테고리_이름} cashco 521에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. cashco 521 20 페이지. Total tfe, globe-pattern control valve body iom

cashco 521 설치, 운영 및 유지보수 매뉴얼
7. For units with Reverse Action (ATO-FC)
ac tu a tors pressurize to a level sufficient to
initiate travel to approximately mid-stroke
to hold the plug (3) away from the body (1)
seat.
8. Apply leak detection fluid to all the potential
leak paths:
a. Packing gland nut (5). (Tighten as
nec es sary.)
b. Body (1)-to-bonnet (2) flange tape hole.
c. Body (1) and bonnet (2) bolting (13, 14,
1.3, 1.4, 1.5).
d. End connection blind flange tape hole.
e. Test pressure piping con nec tions.
9. If leakage occurs at:
a. a. above, there is a packing (6) or a
pack ing (6) /stem sub-assembly (9)
failure.
b. b. above, there is a bonnet gasket (11)
failure.
c. c. above, there is a bonnet gasket (11),
or TFE core (1.2) failure.
d. d. above, there is a bellows sub-as sem bly
(8) failure.
10. Following this test procedure may help
to solve main te nance problems when
combined with visual ex am i na tion of
disassembled body assembly (BA).
C. Separation of Body/Actuator:
1. Reference the Actuator IOM-C27-C53 for
item number call outs and drawings for
actuator.
2. Secure the body in a vise with the actuator
assembly (AA) oriented vertically. Place
matchmarks between the body (1) bon net
flange, the bonnet (2) flange, and the yoke
(3) to assist in final ori en ta tion when the
body is dis as sem bled and/or the ac tu a tor
removed. If actuator has handwheel - see
Actuator IOM for removal instructions.
3. Secure and rig the actuator assembly (AA)
for a ver ti cal lift using an overhead hoist.
Remove slack from rigging.
4. This procedure assumes that the body
as sem bly (BA) has been fully assembled
through the bonnet (2), including the packing
gland nut (5) and packing (6).
5. Remove vented pipe plug (12) from body.
6
6. Loosen stem nut (20) by rotating nut CW
(viewed from above) to base of threads.
7. Loosen packing (6) by turning packing gland
nut (5) CCW 2-3 revolutions.
8. Rotate yoke nut (15) CCW to fully loosen
nut.
9A. For ATO-FC Reverse Action Actuators:
a. Connect a temporary air source
to the actuator and pressurize the
actuator to upper limit of the bench
range specified on the valve name
plate. (Pressure will lift the plug head
(3) away from the body's (1) integral
seat until the plug (3) is 100% open.)
b. Place a wrench on the hex surface
of the swivel lower knuckle (44) and
rotate knuckle CCW (viewed from
above ac tu a tor) until lower knuckle dis-
engages from stem (9). Keep track of the
number of full rev o lu tions to dis-engage
and record here. _______________
c. Maintain lift support from above the
Figure 6: Swivel-Type Connector
actuator assembly (AA). Dis-engage
(slide) the swivel lower knuckle (44) out
of the upper knuckle (43) slot.
9B. For ATC-FO Direct Action Actuators:
a. Place a wrench on the hex surface
of the swivel lower knuckle (44) and
rotate knuckle CCW (viewed from
above ac tu a tor) until lower knuckle dis-
engages from stem (9). Keep track of the
number of full rev o lu tions to dis-engage
and record here. ________________
b. Maintain lift support from above the
actuator assembly (AA). Dis-engage
(slide) the swivel lower knuckle (44) out
of the upper knuckle (43) slot.
IOM-521