Danfoss VLT AutomationDrive FC 302 설치 지침 매뉴얼 - 페이지 2

{카테고리_이름} Danfoss VLT AutomationDrive FC 302에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Danfoss VLT AutomationDrive FC 302 12 페이지. Igbt module replacement for d1h–d8h drives
Danfoss VLT AutomationDrive FC 302에 대해서도 마찬가지입니다: 운영 매뉴얼 (16 페이지), 설치 매뉴얼 (20 페이지), 설치 지침 (4 페이지), 설치 지침 매뉴얼 (6 페이지), 설치 매뉴얼 (18 페이지), 설치 지침 매뉴얼 (8 페이지), 설치 지침 매뉴얼 (10 페이지), 설치 매뉴얼 (6 페이지), 설치 매뉴얼 (16 페이지), 사용 설명서 (16 페이지), 설치 지침 매뉴얼 (6 페이지), 설치 매뉴얼 (16 페이지), 설치 매뉴얼 (8 페이지), 설치 지침 매뉴얼 (6 페이지), 설치 매뉴얼 (6 페이지)

Danfoss VLT AutomationDrive FC 302 설치 지침 매뉴얼
Installation Instructions

Installation

If both a bus bar kit and a back-channel cooling kit are
being installed in the cabinet, install the back-channel
cooling kit first.

APPROVALS AND CERTIFICATIONS

®
This VLT
Common AC Drive Modules bus bar kit is UL 508 C
compliant. These installation instructions describe how to
install Danfoss-supplied bus bars which, if followed, meet
specific agency approvals and certifications. Seek agency
approvals or certifications apart from Danfoss if designing
and building other configurations.
Installing DC-link Bus Bars
1.
Install 1 L-bracket inside the top of the enclosure on
each side. Secure each bracket with 3 M5 nuts and
torque to 2.3 Nm (20 in-lb). See Illustration 1.1.
1
L-brackets
2
Illustration 1.1 Installation of DC Bus Bar L-brackets above the
DC Fuses
2.
Install the 6 stand-offs onto the support plate. Torque
to 2.3 Nm (20 in-lb). Refer to Illustration 1.2.
3.
Install the 2 DC-link bus bars onto the support plate
using 3 M5 nuts per bus bar. Torque to 2.3 Nm
(20 in-lb).
2
Bus Bar Kit for 6-pulse, 2-drive System
VLT® Series FC 102, FC 202, and FC 302
DC fuse with microswitch
Danfoss A/S © 02/2016 All rights reserved.
1
Support plate
3
2
Stand-offs
4
Illustration 1.2 Installing DC-link Bus Bars onto Support Plate
4.
With the DC-link bus bars facing downward, slide the
support plate onto the L-brackets. Secure the support
plate with 6 M5 screws and torque to 2.3 Nm (20 in-
lb). Refer to Illustration 1.3.
5.
Install the DC+ and DC- jumper bus bars between
the DC fuses and the DC bus bars. Refer to
Illustration 1.4.
1
L-brackets
2
DC-link bus bar assembly (support plate and bus bars)
Illustration 1.3 Installation of DC Bus Bars onto L-brackets
DC-link bus bars
M5 nut
MI92I102