Danfoss AMV 120 NL + AQT 데이터시트 - 페이지 3
{카테고리_이름} Danfoss AMV 120 NL + AQT에 대한 데이터시트을 온라인으로 검색하거나 PDF를 다운로드하세요. Danfoss AMV 120 NL + AQT 4 페이지. Actuators for three point control
Danfoss AMV 120 NL + AQT에 대해서도 마찬가지입니다: 운영 매뉴얼 (12 페이지), 운영 매뉴얼 (4 페이지)
Data sheet
Installation and
commissioning procedure
(if required)
Do not touch anything on
the PCB!
Do not remove the cover
before the power supply is fully
switched off.
Manual override
(for service purposes only)
Caution:
Do not manually operate the
drive if power is connected!
Do not dismount the actuator
from the valve when it is in a
stem down position!
If dismounted in a stem down
position, there is a high risk that
the actuator gets stuck.
Commissioning
DEN-SMT/SI
Actuators for three point control AMV 110 NL, AMV 120 NL
1. Check the valve neck. The actuator should be
in stem up position (factory setting). Ensure
that the actuator is mounted securely on the
valve body
2. Wire the actuator according to the
wiring diagram
3. The direction of the stem movement can be
observed on the position indicator
③
• Remove cover ①
• Press and hold the button ② (on the
bottom side of the actuator) during manual
override ③
• Replace cover ④
• Install actuator on valve ⑤
The factory setting of the spindle is the fully
stem up position because of easier mechanical
connection of the actuator on the valve.
VD.LE.A6.02 © Danfoss 01/2014
position
indicator
①
Remark:
A 'click' sound after energising the actuator
indicates that the gear wheel has jumped into
normal position.
②
④
⑤
3