Dungs 3020032 설치, 사용 및 유지 관리 지침 - 페이지 13
{카테고리_이름} Dungs 3020032에 대한 설치, 사용 및 유지 관리 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Dungs 3020032 17 페이지. 1st stage gas trains
FILTER MAINTENANCE
Said operation must be performed by skilled personnel.
Check the filter at least once a year!
The filter can be changed without removing the train. If the filter is replaced frequently, it is best to replace
the fastening screws, too.
The maintenance procedure is as follows:
cut off the gas flow by closing the gate;
unscrew the screws and remove the filter cover;
remove the filter and replace it with a new one;
refit the cover, screw it on and tighten screws without overtightening;
test operation and check for leaks.
WIRING SCHEME,
ATTENTION
Before starting any work, the system's power
supply must be cut off.
3092
(see fig. 3)
Black "P"
socket
3
GB
Fig. 3
Black
socket
Brown
D4060