Dunkirk 3ES1 00C 설치 및 운영 매뉴얼 - 페이지 3
{카테고리_이름} Dunkirk 3ES1 00C에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dunkirk 3ES1 00C 20 페이지. Oil-dired cast iron steam boilers

Rulesfor Safe Installationand Operation
1. Readthe Owner'sManualfor SafeOperationcarefully. F ailureto follow
the rulesfor safeoperation andtheinstructions c ancausea malfunction o f
the boiler and result in death, _rious bodily injury, and/or property
damage.
2. Checkyour localcodes and utilityrequirements beforeinstallation. The
installation mustbe in accordance withtheirdirectives, or followNFPA31
- Installation o f Oil Burning Equipment, latestrevision.
3. Beforeservicing, a llowboilerto cool.Nwaysshut offanyelectricity and
oil to boilerwhenworkingon it. Thiswill prevent a nyelectrical s hocksor
burns.
4. Inspect o il lineandconnections f orleaks.
5. Be certain oil burnernozzleis size required.Overfiring will result in
earlyfailureofthe boilersections. T hiswill causedangerous operation.
6. Never vent this boiler into an enclosedspace.Alwaysvent to the
outside.Nevervent to anotherroomor insidea building.
7. Be surethereis adequate air supply for complete combustion.
8. Followa regutar s erviceand maintenance s chedule forefficient a nd
safeoperation.
9. Keepboilerareacleanandfreeof combustible material, g asolineand
otherflammable vaporsand liquids.
This boiler has been designed for residential installations. If used for commercial
applications,all jurisdictionalrequirements must be met. This may requirewiringandlor
piping modifications. T he manufactureris not responsiblefor any changesto the original
design.
BeforeYou Start
Check to be sure you have the dght size boiler before starting the
installation. S ee ratingand capacitytableon precedingpage.Checkthe
ratingplateon the boiler.
You must see that the boiler is suppliedwith the properoil, fresh air for
combustion,and a suitable electricalsupply.Also, the boiler must be
connectedto a suitableventingsystemand an adequatepiping system.
Finally,a thermostat, p roperlylocated,is neededfor controlof the heating
system.If you haveany doubtsas to the variousrequirements, checkwith
local authorities and obtain professional help where needed. THE
OPERATING INSTRUCTIONS and THE FINAL CHECKS AND
ADJUSTMENTS are vital to the properand safe operationof the heating
system. T akethetimeto be suretheyare all done.
Thefollowing stepsareall necessary for properinstallation andsafe
operation of yourboiler.
1.
LOCATING THE BOILER
2.
OILSUPPLY AND PIPING
3.
FRESHAIR FORCOMBUSTION
4.
PIPINGCONNECTIONS
5.
CHIMNEY & VENTPIPECONNECTIONS
6.
ELECTRICAL WIRING
7.
THERMOSTAT LOCATION
8.
CHECKING &ADJUSTING
9.
MAINTENANCE