All installations
must conform
to the requirements
of
the authority
having
jurisdiction.
Such
applicable
requirements
take
precedence
over
the
general
instructions
of this manual.
Where required
by the authority
having jurisdiction,
the installation
must conform to the American
Society
of Mechanical
Engineers
Safety Code for Controls
and Safety Devices for Automatically
Fired Boilers,
ANSI/ASME
No. CSD-1.
Locate boiler in front offinat position before removing
crate. Provide a level solid base as near chimney
as
possible
and centrally
located
with respect
to the
heat distribution
system
as practical.
Allow 24 inches in the front, top and right hand side
for servicing
and cleaning,
or removing
tankless
water heating
coil.
It is recommended
that 24 inches be allowed in back
of boiler for convenience
when
skimming
hole is
used.
When installed
in a utility room, the door should
be
wide enough to allow the largest boiler part to enter,
or to permit replacement
of another
appliance
such
as a water heater.
The boiler shall be installed such that the oil ignition
system
components
are
protected
from
water
(dripping,
spraying,
rain
etc.)
during
appliance
operation
and service.
FOR
INSTALLATION
ON
NON-COMBUSTIBLE
FLOORS
ONLY-
The boiler must not be installed on
carpeting
or vinyl flooring.
Minimum
clearances
to
combustible
construction
are:
TOP ........................................
24 IN.
FRONT
...................................
24 IN.
FLUE CONNECTOR
................
9 IN.
REAR
.....................................
24 IN.
LEFT SIDE ...............................
6 IN.
RIGHT SIDE ............................
241N.
MINIMUM CLEARANCES
TO COMBUSTIBLE
CONSTRUCTION
(AS SEEN FROM ABOVE)
T
24"
• 6" _24"--
24"
[
NOTE:
Clearance
for access
should
exceed
fire
protection
clearance.