Dunkirk EXCELSIOR Series 지침

{카테고리_이름} Dunkirk EXCELSIOR Series에 대한 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Dunkirk EXCELSIOR Series 4 페이지. Oil fired boiler, knockdown assembly

This assembly must be completed by a qualified installer or service agency, in accordance with the
manufacturer's instructions, and in accordance with all codes and requirements of the authority having
jurisdiction. Failure to follow these instructions could result in fire or explosion resulting in property dam-
1.
Remove all components from crate. It may be to the
installer's advantage to place the cast iron boiler block
close to where the final installation location will be.
2.
Install rubber grommets in rear top plate. Attach top
and bottom plates to boiler with brass bolts and wash-
ers. Be sure top flanges point toward the front of the
boiler or the top panel will not fit on the boiler. See
Figure
1.
Figure 1
KNOCKDOWN ASSEMBLY
Instructions for
Excelsior oil Fired Boiler
!
age, personal injury, or loss of life.
WARNING
3.
Wrap insulation around boiler with the backing side
out. Wrap 2 banding strips around insulation. Cinch
banding together with plastic buckles provided. See
2. Cut off excess banding material.
Figure
Insulation straps with buckles
4.
Attach pipe nipples to supply and return outlets. Be
sure to use pipe dope before screwing into boiler.
1
P/N 240007210, Rev. A [04/08]
Figure 2