Danfoss 176F4170 설치 매뉴얼 - 페이지 5

{카테고리_이름} Danfoss 176F4170에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Danfoss 176F4170 6 페이지. Ground bar kit for fk09/fb09 and fk10/fb10, ic7 series frequency converters

Danfoss 176F4170 설치 매뉴얼
Ground Bar Kit for FK09/FB09 and FK10/FB10
Installation Guide
2.
Fasten 1 M5x12 screw (T25) in the center of the ground bar, attaching it to the lower EMC shield.
Illustration 3: Installation of Single Ground Bar (FK09a/FB09a, FK10a/FB10a, FK10c/FB10c)
2.4 Installing the Split Ground Bar
For kits with a 2-part split ground bar, use the following steps to attach the left and right sections of the ground bar.
1.
Attach the left ground bar between the left side bracket and the EMC shield using 2 M5x18 screws (T25), 1 in each end of
the ground bar.
The right ground bar attaches to the EMC shield just below the position of the left ground bar. See
Danfoss A/S © 2022.10
T25
T25
Installation
T25
Illustration
4.
AN422434236428en-000201 / 136R0288 | 5