Dunster House DUTCH BARN I 설치 매뉴얼 - 페이지 15

{카테고리_이름} Dunster House DUTCH BARN I에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dunster House DUTCH BARN I 16 페이지.

Dunster House DUTCH BARN I 설치 매뉴얼
STEP 11 (cont.): FELT
STEP 12: FASCIA BOARD AND DIAMOND FINIAL
Items:
4x
ST-PT1670750.75.75 (Fascia board)
4x
ST-PT1670710.75.80.A (Fascia board)
FINIAL
2x
26x 35mm SCREWS
Principle of installation - Front views
35mm
Screws
12a) Position the fascia boards to the correct position as shown in the
diagram below. Fascia boards should overhang the roof boards by 10mm.
Fix each fascia board to the wind brace by using 4x 35mm screws.
12b) Position the diamond finials to correct position as shown in the
diagram below. Fix each diamond final onto the wind brace by using 2x
35mm screws.
35mm Screws
ST-PT1670710.75.80.A
Finial
Assembly Steps
11c) Top layer of felt position onto the ridge so that your
shed resembles the diagram shown in Fig.3. Fix the felt
to the roof using the clout nails provided, again using
200mm centres between each clout nail.
Position of fascia boards
and diamond finials
ST-PT1670750.75.75
Pre-drill parts before fixing with screws
FRONT
Felt
10mm COUT NAIL
(Distance between
nails approx. 70mm)
Page 15