Dunster House E3-2515SS 설치 매뉴얼 - 페이지 13
{카테고리_이름} Dunster House E3-2515SS에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dunster House E3-2515SS 14 페이지.
Shingles Installation
Step F
Bend up against cabin side wall
Shingles Installation
Step G
N.1960 - Requires to be cut
ZN.1670.B
F.3305
All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture
1.5 x 2.5m (28mm) Side Store
Roof membrane
Place one more row and
secure the half that falls
on top of the roof boards.
35mm Screws
N.1960 - Requires to be cut
ZN.1670.B
35mm Screws
Page 12