Free2Move eSolutions ProWallbox 설치 매뉴얼 - 페이지 4
{카테고리_이름} Free2Move eSolutions ProWallbox에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Free2Move eSolutions ProWallbox 14 페이지.
2.
For the three-phase or single-phase electrical connection, refer to the dedicated
meter installation manual included in the Power Meter package.
3.
Feed the Modbus communication cables through the eProWallbox box sheath (C).
Suggested cable: STP class 5E, 0.5 mm2 section.
4.
Use the following order for connecting the communication cables from the
PowerMeter to the eProWallbox. Starting from left on the eProWallbox RS485
output port CN12.
PowerMeter
5.
If included connect the Current Transformers as indicated in the meter installation
manual, paying attention to drawn through the clamp the line according to the
direction indicated on the sensor. The neutral cable must not be drawn through the
clamp.
Installation manual - Annex
Gavazzi EM330
13 12 11 10
GND A- B+ T
GND -
+
CN12 Port
Do not try to install the PowerMeter if you are not qualified as a
professional electrician. Such behavior can cause serious danger and
harm to you and to the people, things or animals around you.
A d v a n c e d f u n c t i o n a l i t i e s s e t u p
Gavazzi EM111
7
6
5
4
GND B+ A- T
GND -
+
CN12 Port
4
Finder 7M
A SC B
GND -
+
CN12 Port