freebeat MORPH 빠른 시작 매뉴얼 - 페이지 15
{카테고리_이름} freebeat MORPH에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. freebeat MORPH 18 페이지.
STEP 11. INDOOR WORKING STATION
FRONT
1. Align the screw holes located at the lower end of the bike rack's
main body with the corresponding holes on the bottom tube of the
bike frame. Insert the screws into the aligned holes.
2. Screw in the hex socket countersunk screw and use a tool to tighten
it securely.
3. Install and tighten the four corners of the product following the
sequence described above.
M6
• The front station's bottom
tube is shorter than the rear
station's bottom tube, and
both were packed together
with the rear working station.