DANLERS EasyZAPP EZ CEFL 설치 참고 사항 - 페이지 2

{카테고리_이름} DANLERS EasyZAPP EZ CEFL에 대한 설치 참고 사항을 온라인으로 검색하거나 PDF를 다운로드하세요. DANLERS EasyZAPP EZ CEFL 2 페이지. Ceiling flush mounted switches

DANLERS EasyZAPP EZ CEFL 설치 참고 사항
Installation procedure
1. Please read these notes carefully before commencing work. In case of doubt
please consult a qualified electrician. Ensure wires and cables are securely held
within the connection terminals.
IMPORTANT: The EZ CEFL Control Unit clock battery must be engaged (ON)
prior to installation by switching the RED dip switch (see diagram E) to the
DOWN position.
2. POSITIONING: The EZ CEFL switch should be installed to achieve correct
coverage of the area, see diagram B. If the photocell override facility (enabled
via EasyZAPP app) is required, the switch must be located above an area where
daylight can give greater illumination than the artificial light. Avoid locating this
product where it is exposed to drafty conditions (exposed lobbies, open ceiling
voids or near fans) or near heat sources. To cover large areas PIRs should be
spaced in a 5 metre grid formation.
3. Disconnect the PIR from the circuit before performing insulation testing of the
wiring circuit.
4. Do not connect on a circuit with large inductive loads, as induced spikes may
cause false triggering or damage the PIR.
5. EZ CEFL must be connected to the EasyZAPP Power Supply (CZPS) via the
EasyZAPP communication cable provided, for wiring see diagrams C and D.
NOTE: The use of non EasyZAPP connectors may damage the
EZ CEFL or CZPS and will invalidate the warranty.
Settings and calibration
ALL settings are adjusted by EasyZAPP App as detailed in the free to download
EasyZAPP App User Guide, including:
Timeout: Adjustable time lag from 10 seconds to 24 hours.
Brightness: Adjustable switching threshold, 30 to 1000 lux and inactive.
EZ CEFL must be calibrated as instructed on the user guide manual.
Batch Configure: For configuring multiple EZ CEFL controls with identical settings.
Name: For identifying individual controls.
Password: For security against accidental or malicious alteration.
Please visit www.danlers.co.uk to download the EasyZAPP user guide.
A: Mounting diagram
CEILING VOID
(At least 78mm deep)
75mm circular hole
cut for PIR switch
B: Detection diagram
Strong detection zone
i.e. person moving arm
or walking towards PIR
up to 5m
up to 7m
C: Wiring diagram
Single EZ CEFL
L
SL
L
N
100 - 260 VAC
50 / 60 Hz
load
N
E: Connector diagram
Several EZ CEFL wired in parallel
L
IMPORTANT
L
L
L
Red dip switch (MUST be
N
N
N
SL
switched DOWN (towards lens)
SL
SL
100-260 VAC
SL
to engage clock battery ON)
50 / 60 Hz
L
L
Power Supply
N
N
For optimum coverage
recommended
mounting height: 2.4 to 5m
Single EZ CEFL
Secondary detection
zone i.e. person
L
SL
L
walking perpendicular
to PIR
N
100 - 260 VAC
50 / 60 Hz
N
D: Wiring diagram
Several EZ CEFL wired in parallel
L
L
L
L
N
N
N
SL
SL
SL
100-260 VAC
50 / 60 Hz
N
Control Unit
load
Telejack connector
load
load