DANLERS CZ HB ND 10VDC 설치 참고 사항 - 페이지 2
{카테고리_이름} DANLERS CZ HB ND 10VDC에 대한 설치 참고 사항을 온라인으로 검색하거나 PDF를 다운로드하세요. DANLERS CZ HB ND 10VDC 2 페이지. Controlzapp high bay controls for 1-10vdc ballasts
Installation procedure
1. Please read these notes carefully before commencing work. In case of doubt
please consult a qualified electrician. Ensure wires and cables are securely held
within the connection terminals.
IMPORTANT: The CZ HB (xx) 10VDC Control Unit clock battery must be
engaged (ON) prior to installation by switching the RED dip switch (see
diagram D) to the DOWN position.
2. POSITIONING: The CZ HB (xx) 10VDC switch should be installed to achieve
correct coverage of the area, see diagram B. If the photocell override facility
(enabled via ControlZAPP app) is required, the switch must be located above an
area where daylight can give greater illumination than the artificial light. Avoid
locating this product where it is exposed to drafty conditions (exposed lobbies,
open ceiling voids or near fans) or near heat sources.
3. Disconnect the ControlZAPP device from the circuit before performing insulation
testing of the wiring circuit.
4. Do not connect on a circuit with large inductive loads, as induced spikes may
cause false triggering or damage the device.
5. CZ HB (xx) 10VDC must be connected to the ControlZAPP Power Supply (CZPS)
via the ControlZAPP communication cable (telejack)provided, for wiring see
diagrams C and D. NOTE: The use of non ControlZAPP connectors may damage
the CZ HB (xx) 10VDC or CZPS and will invalidate the warranty).
6. Knockout or drill the appropriate holes on the mounting plate for attaching
the plate to the ceiling or back box (if applicable). Feed telejack through the
appropriate (side or rear) entry hole. Screw the back mounting plate to the ceiling
or back box via the mounting holes. Push the telejack connector into the sensor
head terminal. Push the sensor head onto the mounting plate and align the side
clips with the slots on the sensor heads.
Settings and calibration
NOTE: ALL settings are adjusted by ControlZAPP App as specified in the
ControlZAPP App User Guide (downloadable from the DANLERS website)
including: MODE settings, SCHEDULER settings and photocell settings and
intelligent photocell calibration procedure.
MODE settings include: Detect Movement (enable or disable), Sensitivity, Short
Visit Mode (with timer), Turn ON automatically (Presence detection or Absence
detection), Turn OFF timeout (from10sec to 23hrs 59min 59sec), Respond to
Daylight (enabled or disabled) the calibration process must be run for the intelligent
photocell to work. Delay before ON or Delay before OFF timers, Scene Recall (ON
or OFF).
SCHEDULER settings include:
DAY TYPES (defining times for each of the different Modes to occur).
WEEKLY SCHEDULE (defining which Day Types are assigned to different days of
the week).
EXCEPTIONS (defining exceptions to the schedule such as holidays).
VIEW ON CALENDAR (overview of schedule).
A: Detection diagrams
NARROW
SPOT
DETECTION (ND)
DETECTION (SP)
Mounting height
Mounting height
up to 12m
up to 20m
Perspective view -
Perspective view -
ceiling mounted
ceiling mounted
Up
to
15m
Up to 5m
diameter
Up to 3m
B: Wiring diagram
_
+
CZ HB (XX) 10VDC
L
SL
N
100 - 260VAC
50/60Hz
Optional
other load
N
C: Mounting plate fixing
Knock out mounting
For telejack entry from
holes or pre-drill
above - knock out
pilot holes.
central mounting hole
D: Connector diagram
IMPORTANT
Red dip switch (MUST be
switched towards centre of control)
to engage clock battery ON
SL
L
L
Power Supply
N
Telejack connector
+
-
WIDE
DETECTION (WD)
Mounting height
up to 14m
Perspective view -
ceiling mounted
Up to 28m
diameter
control lines
+
ballast
-
+
ballast
-
+
ballast
-
For side entry -
Clip telejack into the device
then join device to mounting
knock out side
mounting hole
plate via mounting clips
Control Unit
ON