Casit KEQS08 매뉴얼 - 페이지 4
{카테고리_이름} Casit KEQS08에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Casit KEQS08 20 페이지.
KEQS08
2
Installation
2.1
Diagram of the control unit and electrical connections
8 9 10 11 12 13 14 15 16 17 18 19 20 21
DIP A
ON
KE
1
2
3
4
5
6
7
8
9
10
1
2 3 4 5 6 7
Connection of the POWER SUPPLY
LINE 230 Volt Single-phase alternate cur-
rent. The control unit power supply line
must always be protected with a magnetic-
thermal switch or a pair of 5A fuses.
An earth leakage circuit breaker is recom-
mended but not necessary if already avai-
lable in the site if one is already installed
on the plant.
TEMPI
AC / DC
CODICI
ON
KE
1
2
3
4
5
6
7
8
L1
60
DIP B
L2
40
80
JP1
100
20
6
4
8
2
10
0
MAX
6
4
8
2
10
MIN
OFF
1 2
Control unit power supply 230Vac
Power supply for 230Vac motor and for
3 7
230Vac Signal Light
Power supply for accessories and inputs and
8 21
securities
Electrical lock,
22 23
Power supply of the accessories
"Dry" contacts for light or photocell TEST
24 25
or signal light without fl ashing control card
26 28
Connection of the encoder
JUMPER
Selection of the power supply,
AC/DC
24 Vac output or dc on terminals 18-19-20
JUMPER
"Death man" function (Par. 3.3)
JP1
DIP A
Set up of the logic of the control unit
Exclusion of the inputs,
DIP B
activation of Soft-start (gradual start)
Managing of the remote controlsd, force
Button P
adjustment, increase of the pause time
When in doubt as to the correct connection, if
possible, manually position the automation at the
midpoint of its stroke. Be ready to stop the system
using the STOP control!
To be sure that the opening is really "opening", try
to block the photocells: if the gate begins to close,
the connection is incorrect and the motor OPEN
and CLOSE wires must be inverted.
-4-
Technical Manual
Connection of the MOTOR
Pay attention not to invert
the OPEN and CLOSE poles.