ARBOR INSTALLATION
Option 1
Slide one 24" steel u-channel ground anchor
(part 10) into bottom of each post. Slide
ground anchor until it meets bottom cross
rail. Using 1" self-tapping white-head screw
fasten post to ground anchor.
Using ground anchor installation layout
drawing, dig holes approximately 16" deep.
Set arbor in holes and level. Back fill with soil
removed from holes. For permanent
installation fill with cement.
Option 2
Using ground anchor installation layout
drawing , pound ground anchors into ground
according to dimensions. When pounding
into ground, use block of wood to prevent
ground anchor from bending.
Slide arbor over ground anchors. Using 1"
Ground Anchor
self-tapping white-head screw fasten post to
ground anchor.
Installation Layout
Option 3
Using ground anchor installation layout
drawing, dig holes 16" deep according to
dimensions. Fill with cement and place
ground anchors in wet cement. Be sure that
ground anchors are straight and in accordance
with dimension of ground anchor installation
layout drawing. Allow cement to dry. NOTE:
There is very little room for error with this
installation method.
Slide arbor over ground anchors. Using 1"
self-tapping white-head screw fasten post to
ground anchor.