Duratuf MK4B 조립 지침 매뉴얼 - 페이지 14
{카테고리_이름} Duratuf MK4B에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Duratuf MK4B 16 페이지. Kiwi series, base size 4210mm x 3380mm
Step 1: Attach left hand and right hand barges (C102 &
D102) together with three rivets at top overlap. Posi-
tion Barge Flashings on gable ends. Slide one Spout-
ing (D103) inside another until it measures the cor-
rect length. Rivet together with four rivets. Repeat
with the other Spouting. Position Spouting on the
shed and rivet to barge Flashing at each end. Repeat
Step 1: Attach " T" locking handle with two 8x10mm
screws TO R/H door (Door without the weather-
strip). Slide hook onto square shaft and secure
with a lock washer.
Step 3:
On the back of the left hand door,
position latch so that the hook on
the door handle will be secure and
go in and out easily. Rivet in place
with four rivets.
MK4B BARGE & SPOUTING
SECURITY DOOR (Optional)
Left Hand Door
Step 2: Centralise Barge Flashing on gable end
and rivet in place, one rivet into every
second Rib. Fit two rivets through top of
Barge into Rib. Repeat with other Barge
Flashing. Check Spoutings are straight,
then rivet to Roof one rivet every second
Rib.
Step 2:
Once doors are hung, position the Locking
Stays so they slide into the Locking Brackets
easily. Screw Locking Stays to Door Jamb.
Latch
14
Hook
Right Hand Door