Duratuf PG96 조립 지침 매뉴얼 - 페이지 15
{카테고리_이름} Duratuf PG96에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Duratuf PG96 17 페이지. Base size: 3.020m x 2.020m
SECURING SHED
TIMBER PEGS—WOODEN FLOOR
• The optional Duratuf Timber Peg Down Kit includes six H5 treated timber
pegs that can be hammered into the ground and then attached to the
Base Plate with stainless steel screws. A Garrison timber floor can then
be fitted on top of the Base Plate if required.
BOLT DOWN KIT—CONCRETE
• The optional Duratuf Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
• Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
FITTING A GARRISON FLOOR KIT (OPTIONAL)
• Position the Floor Joists centrally between the side Base Plates
and skew nail each end with two 75mm nails.
• Check that the shed is sitting level and square . Check that the
diagonal Bottom Plate measurements are the same.
This ensures that the shed base is square.
• Place the Floor Boards in position. (You may need to cut the last
Floor Board to the correct width using a Skill Saw.) Nail each
Floor Board in, using two 50mm nails each end and two nails into
each floor joist.
FIT PADBOLT
• Rivet Padbolt to door and keeper onto Door Jamb as shown.
FIT BACK PADBOLT
•
Rivet back pad bolts to pad bolt supports then rivet pad bolt sup-
ports to back of small door (Top and bottom)
•
Using 10mm drill bit, drill hole into top and bottom timber plates
IMPORTANT— CLEAN UP
REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS
THOROUGHLY. FAILURE TO DO THIS WILL RESULT IN CORROSION AND
COULD THEREFORE VOID THE WARRANTY
YOUR DURATUF GARRISON SHED IS NOW COMPLETE. RELAX......
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
.
14
BACK BASE PLATE
JOIST
JOIST
JOIST
FRONT BASE PLATE