Duratuf KIWI KL1 조립 지침 매뉴얼 - 페이지 11
{카테고리_이름} Duratuf KIWI KL1에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Duratuf KIWI KL1 16 페이지.
Note:
Condensation can form on the under side of shed roof. If building paper is required, fit now. Building paper
will need to be supported by netting or roofing twine.
Roof with Clear Panel: Handle Clear Panel with care. The Clear Panel will crack if not fitted correctly.
Riveting: Pre-drill 3.5mm hole through Clear Panel and Steel. Enlarge hole in Clear Panel with drill to allow
for expansion and contraction.
Screwing: Pre-drill a 6mm hole through the Clear panel.
Step 1: Check that the diagonal measurements of the shed are the same. If building on unlevel ground it may be
necessary to temporarily brace the shed with pieces of timber from the packaging.
Step 2: Position first Roof Sheet on the right
hand side of the shed with the LIP on
the left hand side. Position the next Roof
Sheet. Ensure it overlaps correctly
(when fitting a Clear Roof Panel, ensure
it OVERLAPS Roof Sheet). Rivet sheet
joins 500mm from edge, front and back.
Step 3: Position roof so that the front overhang
measures 140mm. Line up Ribs on the
Roof Sheets with Ribs on the Wall
Sheets. Ensure plates are straight then
screw roof to Top plates using one
50mm Roofing Screw on each Rib front
and back.
(Using 4 x 50mm galv clouts, nail clouts
on the outside ribs only, as these are
covered by the Barge flashing.
KL1 ROOF
50mm Clouts in
4 corners
11
Lip this side.
Pan
Rib