APlusLift HW-9KOH 설치 매뉴얼 및 작동 지침 - 페이지 5

{카테고리_이름} APlusLift HW-9KOH에 대한 설치 매뉴얼 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. APlusLift HW-9KOH 17 페이지.

1. Introduction
QTY
1
10
8
1
1
1
2
2
16
4
4
1
4
1
1
1
2
2
2
10
PARTS LIST
Part description
Top beam (two stages plus one
connector)
Hex bots, washers & nuts for two-stages
beam
Hex bolts, washers & nuts for beam
mounting to columns
Overhead Safety Bar
Switch bracket for Overhead safety bar
Long bolt for Overhead safety Bar
Top columns extensions
Columns
Hex Bolts, washers & nuts for column
extensions mounting to columns
lift arms
Arm pins
Power Unit 220 Voltage, single phase
w/ manual release handle
Bolts, washers & nuts for power unit
mounting to column
Hydraulic hose long
Hydraulic hose short
Power Unit Hydraulic Tee Fitting
4.3 inches Extended Fitting to cylinder
Truck adapter sets
Wire rope equalizer cables w/ M18
thread on nuts & washers
Anchor Bolts for two columns
5
Please connect Beam on
ground
M10x30
M10x30
(power unit side)
M6x130 (offside)
Connect arms to carriage
M8X20
30'
3-1/2 FT
Installed to power unit for
two hoses hooking
For two hoses hooking
4 drop-in pads, 4 short, 4
high
M18x160