APlusLift HW-10KOH 설치 및 운영 매뉴얼 - 페이지 9
{카테고리_이름} APlusLift HW-10KOH에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. APlusLift HW-10KOH 20 페이지. 2-post over head car lift 10,000lb capacity
APlusLift HW-10KOH에 대해서도 마찬가지입니다: 설치 매뉴얼 및 작동 지침 (17 페이지)
Step 5 (Installing Power Unit and Routing Hydraulic Hoses)
Mount the power unit onto the main side column with four hex bolts.
Connect two 4 1/4" fittings to both cylinders. Connect T-fitting to the power unit.
Connect short hydraulic hose to the power unit and the cylinder in power unit post.
Connect long hydraulic hose to the power unit and the cylinder in the opposite post.
Run the long hose over the overhead beam.
See figures below for hose layout and routing to the power unit. Do not over tighten the
fittings.
9