APlusLift HW-10KOH 설치 및 운영 매뉴얼 - 페이지 9

{카테고리_이름} APlusLift HW-10KOH에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. APlusLift HW-10KOH 20 페이지. 2-post over head car lift 10,000lb capacity
APlusLift HW-10KOH에 대해서도 마찬가지입니다: 설치 매뉴얼 및 작동 지침 (17 페이지)

APlusLift HW-10KOH 설치 및 운영 매뉴얼
Step 5 (Installing Power Unit and Routing Hydraulic Hoses)
 Mount the power unit onto the main side column with four hex bolts.
 Connect two 4 1/4" fittings to both cylinders. Connect T-fitting to the power unit.
 Connect short hydraulic hose to the power unit and the cylinder in power unit post.
 Connect long hydraulic hose to the power unit and the cylinder in the opposite post.
Run the long hose over the overhead beam.
 See figures below for hose layout and routing to the power unit. Do not over tighten the
fittings.
9