Apollo 1500 설치 매뉴얼 - 페이지 5

{카테고리_이름} Apollo 1500에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Apollo 1500 17 페이지. Swing gate operator

Apollo 1500 설치 매뉴얼

PRE-INSTALLATION CHECKLIST

The following checklist should be used before beginning installation:
Verify that the proper operator has been selected for this application.
Verify proper installation and operation of the gate.
1. Are the hinges servicable?
2. Does the gate swing free and level?
3. Will the gate require a locking device?
4. Is the hinge and stop posts sturdy enough to handle the gate & operator?
Determine the general location of the operator, attachment points, and solar
panel (if used).
1. Is there a suitable location for the operator?
2.Can the solar panel (if used) be mounted in an unobstructed area facing
south (in the northern hemisphere)?
3. Will additional solar panel cable be required?
4. Is electricity available (if required)?
Consider safety and access options. Recommend if needed.
1. Will there be children or animals in the area?
2. Are safety loops, edge switches, or photo beam detectors required?
3. How can the gate be opened in emergencies?
4. How will visitors enter and exit?
5. Will vehicles (and trailers) have sufficient room off roadway to operate any
control devices such as keypads?
5