Apollo 1600 설치 매뉴얼 - 페이지 7
{카테고리_이름} Apollo 1600에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Apollo 1600 17 페이지. Swing gate operator
STEP 1
PIVOT ARM INSTALLATION (standard pull to open)
Location of Pivot Point.
Notes:
PULL TO OPEN pulls gate open (actuator is extended when gate is in the closed position).
PUSH TO OPEN pushes the gate open (actuator is retracted when gate is in the closed
position).
For PUSH TO OPEN installations see page 12.
If a 400 Upgrade Kit is to be used, refer to the 400 instructions for pivot point location.
The following instructions provide up to 105
Left Hand Swing
Gate (closed)
13"
6"
Measurements are taken from
the center of the hinge.
Vertical position
of pivot arm
Pivot ArmMust be level
OPERATOR INSTALLATION
o
of swing.
Direction of
opening
Top View
1/2"
Hinge post
Right Hand Swing
Center Line of attachment
point for gate bracket
7
13"
6"
Front View