PRE-INSTALLATION CHECKLIST
The following checklist should be used before beginning installation:
♦
Verify that the proper operator has been selected for this application.
♦
Verify proper installation and operation of the gate.
1. Are all rollers covered with a protective housing?
2. Are the rollers servicable?
3. Does the gate roll free and level?
4. Will the gate require a locking device?
5. Are the main posts sturdy enough to handle the gate & operator?
♦
Determine the general location of the operator, chian brackets, and solar
panel (if used).
1. Is there a suitable location for the operator?
2.Can the solar panel (if used) be mounted in an unobstructed area facing
south?
3. Will additional solar panel cable be required?
4. Is electricity available (if required)?
♦
Consider safety and access options. Recommend if needed.
1. Will there be chidren or animals in the area?
2. Are safety loops, edge switches, or photo beam detectors required?
3. How can the gate be opened in emergencies?
4. How will visitors enter and exit?
5. Will vehicles (and trailers) have sufficient room off roadway to operate any
control devices such as keypads?
4