DURKOPP ADLER 767 - 설치 지침 매뉴얼 - 페이지 7
{카테고리_이름} DURKOPP ADLER 767 -에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DURKOPP ADLER 767 - 16 페이지. Converting bobbin hook clb 300
DURKOPP ADLER 767 -에 대해서도 마찬가지입니다: 사용 설명서 (18 페이지), 사용 설명서 (16 페이지)
2. Setting up
Packing must be removed prior to setting-up.
–
Remove safety bands and wood from upper part, table and frame.
–
Remove safety bands and block from motor.
2.1 Erecting the upper part
If the special sewing machine was not delivered fully assembled:
–
Screw hinges 2 and 3 to base plate.
Attach upper-part support 1.
–
Fit upper part.
–
Fit and tension V-belt (see section 2.3).
–
Fit belt guard and oil bath.
–
Align surge container 9.
The surge container must be turned so that it is vertical when the upper part of the
machine is vertical.
–
Place oil-recirculation felt 7 in the depression of the oil bath.
The hose 8 must not make contact with moving parts.
2.2 Transport
For internal transport the sewing machine must be lifted and moved by a suitable
vehicle (e.g. a fork-lift).
2.3 V-belt tension
After the machine has been moved the pre-set V-belt tension must be checked.
The tension in the V-belt 6 must be such that it can be depressed by about 10 mm by
applying finger pressure in the middle.
–
Loosen nuts 4 and 5.
–
Swivel drive until V-belt tension is correct.
–
Retighten nuts 4 and 5.
IMPORTANT !
The special sewing machine may only be set up by trained
specialist personnel.
GB
5