Datalogic DL-AXIST Single Ethernet Dock 빠른 시작 매뉴얼
{카테고리_이름} Datalogic DL-AXIST Single Ethernet Dock에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Datalogic DL-AXIST Single Ethernet Dock 2 페이지.
Single Ethernet Dock
Quick Start Guide
Overview
The DL-Axist single Ethernet dock is a charging and
communication dock that supports both Ethernet communication
with a network and USB communication with a host computer.
The dock also contains an auxiliary slot to charge a spare battery.
A power supply is required for battery recharging operations, both
for the PDA and spare battery pack recharging.
Out of the Box
The DL-Axist single Ethernet dock package contains:
1.
DL-Axist single
Ethernet
dock
2.
USB cable (type A to B)
Parts and Functions
Spare Battery Slot
Ethernet/USB Switch
Spare Battery
PDA Slot
Charge LED
Ethernet Port with LED
Power On LED
822002082
(Rev. A)
Jan. 2018
Charge the PDA
The single Ethernet dock provides power to the DL-Axist and
allows the charging of the device's main battery.
To charge the PDA:
1.
Slide the DL-Axist into the PDA slot. The charging LED
indicator on the PDA illuminates red. The dock completes a
full charge in 3 hours for the standard battery or 6 hours
for the extended battery.
2.
When charging is complete, remove the PDA from the PDA
slot.
Charge the Spare Battery
The single Ethernet dock can charge the PDA main battery and a
spare battery simultaneously.
Power Jack
To charge the spare battery:
1.
Insert the spare battery into the spare battery slot,
contacts side first, and then snap it into place. Ensure the
label side is facing up. The dock's spare battery charge LED
illuminates red.
USB Type B
Port
Indicators
2.
When charging is complete, pull the tab and lift the battery
out of the slot.
The spare battery pack recharging slot is compatible with the
following batteries:
•
94ACC0128 DL-Axist Standard Battery Li-Ion 3200 mAH,
3.8V
•
94ACC0129 DL-Axist Extended Battery Li-Ion 6400 mAH,
3.8V
LED Indicators
LED
Status
Power On
Solid Green
Dock is charging.
Spare Battery Charge
Solid Red
Spare Battery is charging.
Solid Yellow
Charging complete.
Ethernet Connector Green LED (right)
Solid Green
Link established.
Blinking Green
Link activity.
Off
No link established.
Ethernet Connector Yellow LED (left)
Off
10 Mb connection.
Solid Yellow
100 Mb connection.